Free template · PDF download

Disaster Recovery Plan Template

Restore your systems after an earthquake, wildfire, outage, or cyberattack. For Los Angeles businesses that depend on their computers, phones, and cloud apps to operate. Fill in each section with your IT provider, set realistic recovery targets, and keep a printed copy offsite. Review it whenever you add a major system or move offices.

By Los Angeles ITUpdated October 9, 202620 items
Your progress: 0 / 20

Tick items as you go. Progress is saved in this browser only.

1. Plan Details and Scope

Define what this plan covers. A disaster recovery plan focuses on restoring IT systems and data. It supports your broader business continuity plan.

Company name
Plan owner (name and title)
Version
Last updated
Last tested
Locations covered
Systems in scope
Systems out of scope
Printed copies kept at (including one offsite)

2. Likely Disaster Scenarios

Check the scenarios that apply to your locations and note anything specific, such as building generator availability or evacuation routes.

Location-specific notes (generator, UPS runtime, evacuation zone)

3. Recovery Objectives by System

RTO (Recovery Time Objective) is how long the system can be down. RPO (Recovery Point Objective) is how much data, measured in time, you can afford to lose. Shorter targets cost more, so set them by business impact.

System Business function Priority (1–3) RTO RPO Recovery method
Email (Microsoft 365 / Google Workspace)
File storage (OneDrive, SharePoint, server)
Line-of-business app (EHR, PMS, CRM, accounting)
Phones / VoIP
Internet and firewall
Payroll

4. Critical Systems Inventory

List the hardware and services that matter. Note where license keys and admin credentials are stored, not the credentials themselves.

System / device Location (onsite / cloud) Vendor Model or plan Admin access stored in Notes

5. Backup Locations

Follow the 3-2-1 rule: three copies of data, on two types of media, with one offsite. Keep at least one copy immutable or offline. For earthquake risk, make sure one copy is outside the Los Angeles region.

Data / system Backup method Frequency Onsite copy Offsite / cloud copy (region) Immutable? Retention Last test restore
Backup monitoring is checked by
Backup failure alerts go to

6. Recovery Procedures

Write high-level steps for each critical system in priority order. Your IT provider should keep detailed technical runbooks.

Step 1 — Assess and declare

Who can declare a disaster
Criteria for declaring

Step 2 — Notify

Step 3 — Restore in priority order

Priority 1 systems and steps
Priority 2 systems and steps
Priority 3 systems and steps

Step 4 — Verify and return to normal

7. Roles and Responsibilities

Role Name Mobile Backup person Responsibilities
DR coordinator Declares disaster, coordinates recovery
IT provider / technical lead Restores systems and data
Owner / executive Approves spending and major decisions
Communications Staff, client, and vendor updates
Facilities Building access, power, landlord

8. Vendor Contacts

Vendor / service Account or customer number Support phone Support email or portal Contract / SLA notes
Internet service provider
Backup internet (LTE/5G or secondary ISP)
Microsoft 365 / Google Workspace admin
Backup provider
Phone / VoIP provider
Line-of-business software
Hardware vendor / warranty
Building management
Utility (LADWP / SCE)

9. Alternate Work Location

Most office work can continue from home if laptops, cloud apps, and phones are set up in advance. Plan for staff who need special equipment.

Primary alternate: ____ (for example, remote work from home) [[FIELD]]Secondary alternate site address

Who can work remotely
Equipment needed at alternate site
How phones are forwarded

How staff check in after a disaster (text tree, group chat, call-in number): ____

10. Power and Connectivity

11. Testing and Maintenance Schedule

Test Frequency Last completed Next due Owner
File-level restore test Quarterly
Full system restore test Annually
Tabletop walkthrough of this plan Annually
Contact list review Every 6 months
UPS battery test Annually
Failover internet test Every 6 months

Need help?

Los Angeles IT can review this plan with you, set up offsite and immutable backups, and run your restore tests: (213) 465-7536 · support@losangelesit.com · losangelesit.com · $95/hr, no contracts.

Download the Disaster Recovery Plan Template

Branded, print-ready PDF. Free, no email required.

Download PDF

Rather have an engineer handle it?

Talk to a Los Angeles IT engineer today. $95/hr, onsite or remote, no contracts.